//ArrowChat Code
Results 1 to 9 of 9

Thread: My on going project.

  1. #1
    mrtwidster1 is offline At The Back Of The Pack Arm chair racerFirst time rider
    Join Date
    Nov 2007
    Location
    tn. usa
    --
    169

    My on going project.

    Been working on this awhile. I hope to get it done this year.


  2. #2
    Join Date
    Mar 2013
    Location
    Baldwin, Wi
    --
    603
    Looks great love the white, inverts and all the red anodized hardware.
    85 Tri-z Power valve on Inverts
    85 Tri-z Basket Case
    01 gsxr750 engine/Tri-z frame (long long way from complete)

  3. #3
    Join Date
    Oct 2003
    Location
    STL
    --
    3,560
    that bike is re-god-damned-diculous! nice work man, seriously sweet build. been watching this develop with the inverts especially. Whats 'left' to finish ?
    TrikeFest 07,08,09,10,11,12,13,14 SandPuppie's Ride 07,08,09 Imperial Invasion 09, 13

  4. #4
    mrtwidster1 is offline At The Back Of The Pack Arm chair racerFirst time rider
    Join Date
    Nov 2007
    Location
    tn. usa
    --
    169
    Quote Originally Posted by JasonB View Post
    Whats 'left' to finish ?
    Thanks for the compliments!
    Misc powder coating, anodizing, polishing ect. Still got to get the CR jug fitted for a new piston. May have some porting. Undecided on that. Need to install the 01 ignition. Still several small things. Working on the airbox now. Fabricated a TRX style.
    My son has "Broke" the angles on the rear skid plate.When he ships it to me I will finish that. Still have to do some more fab work to the engine skid plate.
    Would not take much to make this bike a runner like it is, but it would not be what I want. Still have to prep and base/clearcoat the tank. Still not decided on the pipe finish for the Jemco, May put the selvys on it. Not sure about a few things that go on this one. I have a lot of custom one off parts that was made for this project.
    I am limited to my work environment so the progress is slow.
    Last edited by mrtwidster1; 02-20-2014 at 09:30 AM.

  5. #5
    mrtwidster1 is offline At The Back Of The Pack Arm chair racerFirst time rider
    Join Date
    Nov 2007
    Location
    tn. usa
    --
    169

    AIR BOX progress

    Pic of airbox "Roughed In" Still need to fab and install mounting hardware. Just mocked up now for fitment and then dis_assembled. Will polish or powder coat.



    Last edited by mrtwidster1; 02-22-2014 at 09:42 PM. Reason: Spelling

  6. #6
    Join Date
    Jan 2011
    Location
    Choctaw, OK
    --
    2,755
    DANG TONY!!!!! Good Job Brother

  7. #7
    Join Date
    Oct 2002
    Location
    Northeast
    --
    17,460
    Nice, breathing on it's own!!

    I just got a Milller TIG and so far, I'm terrible at it, (that was only 20 minutes though) I Hope to make you guys some nice stuff needed down the line......
    All our government does is distract us while they steal from us, misspend our tax $ and ruin our country

  8. #8
    mrtwidster1 is offline At The Back Of The Pack Arm chair racerFirst time rider
    Join Date
    Nov 2007
    Location
    tn. usa
    --
    169
    Thanks Captain. Good to see your still out and about.

    Thanks DC. Hope you are recovering well.

  9. #9
    mrtwidster1 is offline At The Back Of The Pack Arm chair racerFirst time rider
    Join Date
    Nov 2007
    Location
    tn. usa
    --
    169

    Skidplate I fabricated

    11 ga Stainless.
    Still have to put come holes in it. Probably polish the underside and PC the top side.

//ArrowChat Integreation Code //